VDOT News - Hampton Roads
RELEASE: CONTACT: |
IMMEDIATE Tim Kelley 757-956-3033 [email protected] |
HRO-195509 Sept. 9, 2022 |
ROUTE 690 BRIDGE REPLACEMENT PROJECT COMPLETED AHEAD OF SCHEDULE IN ISLE OF WIGHT COUNTY
Ennis Mill Road open to traffic as of Sept. 9
ISLE OF WIGHT COUNTY – As of Sept. 9, Route 690 (Ennis Mill Road) is open to traffic following the early completion of a bridge replacement project over Lake Prince/Ennis Pond.
Virginia Department of Transportation (VDOT) contractor crews replaced the existing bridge with a pre-stressed concrete box beam bridge with permanent sheet pile walls widened to 23-feet and lengthened to 59-feet, and completed roadway widening to match the bridge approaches in both directions.
Bryant Structures, Inc. began construction on the $1.7 million project in December 2021 and was originally scheduled to be completed in October 2022.
To learn about other VDOT Hampton Roads’ projects, visit:
https://www.virginiadot.org/projects/hampton%20roads/defaultSort.asp.
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.